01
Inspection and Moisture Mapping
We walk the attic, walls, and crawl space with a moisture meter, thermal imaging camera, and boroscope camera to find every wet zone. You get a written scope the same day, plus photos of what we found. This is where we confirm whether the insulation can be dried or has to come out.
02
Containment and Tear-Out
We seal doorways and HVAC returns with plastic sheeting and set up a negative air machine so dust and spores don't migrate into living space. Old insulation goes into sealed bags and out to the curb. A typical 1,200 square foot attic takes four to six hours to strip.
03
Drying and Antimicrobial Treatment
With the insulation gone, we set Dri-Eaz and Phoenix Restoration Equipment dehumidifiers and air movers to dry the framing and sheathing. Cavities get treated with antimicrobial solution. We monitor with a hygrometer and infrared thermometer until readings hit dry standard, usually 24 to 72 hours.
04
Verification and Clearance
Before anything new goes in, we re-check every cavity. If mold growth was present, we follow IICRC AMRT protocols and can arrange third-party clearance testing. You get documentation of dry readings, which your insurance adjuster and any future buyer will want to see.
05
New Insulation Installation
We install new batts or blown-in insulation to the R-value your home needs, seal air gaps around can lights and top plates, and reinstall any drywall or baseboards we removed. Final walkthrough takes about 30 minutes, and we leave the workspace cleaner than we found it.